Metropolitan St. Louis Sewer District | Lemay WWTP Wet Weather Expansion

Metropolitan St. Louis Sewer District | Lemay WWTP Wet Weather Expansion


CLIENT

Metropolitan St. Louis Sewer District

LOCATION

St. Louis, Missouri

SIZE

75-foot-deep excavation
558-foot-long tunnel
20,000 cubic yards of concrete
10,000 linear feet of concrete pipe

PROJECT SIZE

$94.9 million

AWARDS

PROJECT NOTES

This project increased the capacity of the Lemay Wastewater Treatment Plant and enhanced plant operations under a wide variety of operating conditions including heavy storm surges.

Improvements included two grit basins (including elevated walkway decks) with channel grinders, a primary sludge pump station, and a grit handling building and four primary clarifiers. Major components included 75-foot-deep excavation and earth moving as well as a 558-foot-long tunnel, plus installation of 12-foot-diameter storm and sewer piping and numerous large cast-in-place underground vaults/junction chambers. The team poured about 20,000 cubic yards of concrete and placed over 10,000 linear feet of concrete pipe at the site. The project also entailed associated piping, valves, yard structures, electrical components and instrumentation, as well as odor control for new and existing facilities. Tarlton poured concrete floors (flatwork) for the Wet Weather Vault, Influent Flowmeter Vault and Primary Sludge Pumping Station.

“Tarlton was instrumental in helping MSD achieve one of the smoothest startups for a water treatment plant MSD ever had.”
Jeff Theerman, Retired Executive Director, MSD

Featured Civil Projects

See All Civil Projects

    • Civil

    Washington University in St. Louis | South 40 Utility Expansion

    St. Louis, Missouri

    • Civil

    St. Louis Lambert International Airport | ADA Upgrades

    St. Louis, Missouri

    • Civil

    Forest Park Forever | Government Hill Concrete

    St. Louis, Missouri