Missouri American Water | Generator Addition, Phase 1

Missouri American Water | Generator Addition, Phase 1


CLIENT

Missouri American Water

LOCATION

Chesterfield, Missouri

SIZE

24,000 sf

PROJECT SIZE

$6.8 million

AWARDS

PROJECT NOTES

Tarlton served as the General Contractor for the Missouri American Water’s Generator Addition. Phase 1 to install earthquake resistant plant emergency generators to supply power to the plant in case of large power outages. Work included construction of a new 50’x25’ switchgear building and associated concrete foundations, relocation of existing utilities a new electrical duct bank between the existing CP3B and an additional substation.

Additional work included:

– installation of stairs, railings, and equipment access platforms
– a retaining wall, retained earth fill near the existing CP3B electrical substation
– installation of three 3.25-megawatt emergency generators
– two 6,000-gallon fuel storage tanks
– additional sections of switchgear in the existing CP3B substation

Featured Water & Wastewater Projects

See All Water & Wastewater Projects

  • MWC Central Plant water plant basin replacement
    • Water & Wastewater

    Missouri American Water | Central Plant Basin 1-7 Replacement

    Chesterfield, Missouri

    • Water & Wastewater

    Kerry Foods & Flavours | Wastewater Pretreatment Facility

    Affton, Missouri

    • Water & Wastewater

    Illinois American Water | Granite City UV Disinfection

    Granite City, Illinois